Click For Crochet Abbreviations List
A warm, women's sweater with braids is just what you need in a cold winter. Gentle orange pullover knitting, knitting scheme and description.
Size: 40
You will need: 600 g of orange “Merino de luxe” yarn (50% wool, 50% acrylic, 100 g / 280 m) in 2 additions; Knitting needles number 7 and number 8.
Wrong surface: pattern according to the scheme.
Knitting density: 15 points x 16 p. = 10 x 10 cm, connected by a purl on the spokes number 8.
Back: on the needles number 8, dial 71 p. And knit so; edge, 10 out., 49 p. pattern pattern, 10 out., edge. Having knitted 64 rows from the beginning of work, for armholes, close on both sides in each 2nd row 1 time W'p., 1 time 2 sec. And 1 time 1
sec . After knitting 32 rows from the beginning of decrease for armholes, for neckline close average 21 points and both halves are completed separately, closing
1 point 2 times for rounding the cut on both sides . After knitting 36 rows from the beginning of decreases for armholes, close 17 points of shoulder.
Before: start as back. After knitting 30 rows from the beginning of the reduction for armholes, for the neckline, close the middle 19 points and finish both halves separately, closing the cutout on both sides in each 2nd row 1 time 2 points and 1 time 1 point. Having knitted 36 rows from the start of reductions for armholes, close 17 p. of shoulder.
Sleeves: on the needles number 8, type 39 points and knit: edge, 9 out., 21 paragraphs of the pattern according to the scheme (rapport 1), 9 out, edge. For the bevels, add on both sides in each 10th row 8 times 1 p. Add the added loops to the inside of the back.
After knitting 90 rows from the beginning of work, for the neckline, close each side in each 2nd row 1 time 3 sections, 2 times 2 sections, 8 times 1 section and 1 time 2 points. Close the remaining hinges.
Collar: on the spokes number 7, type 25 points and knit: edgeband, 21 points of the pattern according to the pattern (rapport 1), 2 out, edging. Knitting 84 rows from the start of work, close all the loops.
Assembly: perform shoulder seams. Sew the sleeves. Perform side seams and sleeve seams. Run the seam collar. Sew a collar to the neckline.
Source