Emma

Knitting Boots with Ribbons

Click For Crochet Abbreviations List

You will need: 250 g pink melange yarn; 80 g beige acrylic yarn; Hook № 4.5; 2 m satin ribbon; 16 small rivets.

IPMs. (concave) column B/n: Link art. b/n by entering the hook with the faces. Side under the foot of the column of the previous row.

The semist. With the relief of the...: Connect the half-column by entering the hook only under the back thread of the base row. Art. c/N. With relief of...: Link art. c/n By entering the hook only under the back thread of the base row loop.

Density of knitting, columns B/n: 13 p. and 14 P. = 10 x 10 cm

Sole: A beige thread to tie a chain of 24. N., not pulling. 1st P.: 2 P. Lifting, enter the hook into the 4th. P. Off the hook and tie 1 half, then knit to 1 half. In each ad. Until the end of the chain, in the initial P. Link 4 half-st. and continue to knit on the free edge of the chain, 1 half. In each ad. N., in the last build. P. Link 3 half. and 1 co-ed. Art. In the 2nd. P. lifting; 2nd P.: 2 P. lifting, 1 semist. With the relief of the In the next 22 semist., 2 semist. With the relief of the In the next 4 semist., on 1 semist. With the relief of the In the next 22 semist., 2 semist. With the relief of the In the next 3 semist., 1 half. Into the base loop for the P. Lifting and 1 co-ed. Art. In the 2nd. P. lifting; 3rd p.: 2 P. lifting, 1 semist. With the relief of the In the next 11 semist., on 1 art. c/N with relief In the next 11 half., 4 x (1 c/n with the relief of the next half, 2 St. c/N with the relief of the next half, and 1st. c/N with the relief of the N. In the following 11 semist., 1 semist. With the relief of the N. In the next 11 half. , 3 x (1 semist. With the relief of the second half, 2 semist. With the relief of the second half.), 1 semist. Into the base loop for the P. Lifting, 1 co-ed. Art. In the 2nd. P. lifting; 4th p.: 2 P. lifting, 1 semist. With the relief of the In the next 14 p., 1 art. c/N with relief In the next 8 art. c/N., 4 x (1st. S/n with the relief of the 2 St. C/N., 2 St. C/N with relief of the next half), 1 art. c/N with relief In the next 8 art. c/N., 1 semist. With the relief of the In the next 14 semist., 3 x (1 semist. With the relief of the second half, 2 semist. With the relief of the second half.), 1 semist. Into the base loop for the P. Lifting, 1 co-ed. Art. In the 2nd. P. lifting; 5th R.: 3. P. lifting, 1 art. c/N with relief In each loop of the previous row, 1 coed. Art. In the 3rd. P. lifting; 6th R.: 1 AD P. I. 1 Art. b/N N. Lifting of the previous row, 1 Art. b/N in each art. S/N of the previous row, 1 co-ed. Art. In the P. lifting; Work to finish.


The main part of the Golenishche and the capes: a pink thread in 2 addition to tie a chain of 30. N., not pulling (or thicker crochet); 1st P.: 1 AD P. Lifting, enter the hook into the 3rd. P. Off the hook and tie 1st. b/N, further on 1 art. b/n per each ad Up to the last 10 years. N., 3 art. b/N to the next build. P., 1 art. b/N in each next build. P., in the initial build. P. Link 5 art. c/N (mouse) and continue to knit on the second side of the same chain, 1st. b/N in the next 8. N., 3 art. b/N in the 10th. P., 1 art. b/n per each ad P. To the end of the chain, 1 art. b/N in the last build. P. and turn the work (= 68 St. b/n, including lifting); 2nd P.: Mark on both sides of the chain second of 3 art. b/N, which were connected to the 10th. P. From the beginning of the chain (i.e. from the AP, to which were connected 5 art. b/n for the soap), because in these places will be added to form the upper part and lateral parts; 1 AD. P. lifting, 1 art. b/N in each p. of the previous row up to the mark, 3 art. b/N in marked P., 1 art. b/N in each loop of the previous row to 5 p. Myska, 2 art. b/N in the next 5 p., 1 art. b/N to the mark, 3 art. b/N in marked P., 1 art. b/N in each loop to the end of the series, 1 art. b/N N. Lifting of the previous series, turn the work; 3rd p.: 1 AD P. lifting, 1 art. b/N to the loop above the mark (to the average of 3 v. b/N, connected in the marked loop), 3 art. b/N in the next loop, 1st. b/N in each Next loop to add the SOAP, 5 x (1st. b/N in the next loop, 2 St. b/N in the Next loop), 1 art. b/N to the loop above the mark, 3 art. b/N in the next loop, 1st. b/N in each loop to the end of the series, 1 art. b/N P. Lifting, turn the work; 4th p.: 1 AD P. lifting, 1 art. b/N to the loop above the mark, 3 art. b/N in the next loop, 1st. b/N in each Next loop until the addition of the SOAP, 5 x (1st. b/N in the next 2 p., 2 St. b/N in the Next loop), 1 art. b/N to the loop above the mark, 3 art. b/N in the next loop, 1st. b/N in each loop to the end of the series, 1 art. b/N P. Lifting, turn the work; 5th, 6th and 7th p.: Knit as the previous ranks, making additions over the marks for the top, but no longer making additions for the soap, failing 1st. b/N in each loop of the soap; Linking the 7th P., not trimming the thread to continue to knit only on one side of the work, continuing to shape the heel and the top.

Left part: 8th P.: 1 AD. P. Lifting and 1 art. b/N in each loop to the loop above the mark (Middle St. b/N First addition of the previous row), 1 art. b/N and turn the work; 9th and Next series: 1. P. lifting, 1 art. b/N in each loop to the end of the series. 1 art. b/N N. Lifting of the previous series, turn the work. Linking from the inlaid Edge 21 R. For the right shoe and 23 p. For the left boot (because the shoes will "buckle" back in different directions), the job to finish.

Right part: Fasten the thread on the second side of the previously connected part, in the loop above the mark (in the middle of the first addition), 1 art. b/N in each loop, including the N. Lifting of the previous series, turn the work; 9th and Next series: 1. P. lifting, 1 art. b/N to the end of the series, including the N. Lifting of the previous series, turn the work. Linking from inlaid Edge 23 R. For right boot and 21 p. For left boot, work finish.




Assembly: Place the shorter edge of the top over the longer and sew the edge and heel 6 cm from the bottom edge. Sew the sole to the main part, folding the details of the front sides inside; Remove the shoe and to close the previous seam (series of S/N), sew the edges of the Art. c/N of the penultimate row of the soles to the loops of the main part by a secret seam over the line of the previous seam. Cut the satin tape into 8 parts, 4 for each shoe, and with the help of rivets attach them to the boots.

Pattern :




Source : Вязание Приложение к журналу №11/2015







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments