Emma

Knitting Slippers with Cuffs

Click For Crochet Abbreviations List

Each slippers is knitted from 3 parts: A cuff, a reed and the basic part (consists of a heel, lateral sides, the top part, a sole and a soap). The main part is knitted, starting from the heel, then the finished part is sewn with capes.

You will need: 120 g purple and 80 g pink melange acrylic yarn medium thickness; Hook № 3.5.

The density of knitting, columns S/N: 20 p. and 10 p. = 10 x 10 cm.

Heel: A melange thread to tie a chain of 6. 1st P.: 3 P. Lifting, enter the hook in the 5th p. From the hook and bind to 1st. c/N in each ad N., 3. N. N. Start the base series and then knit on the free side of the same chain: 1 art. c/N in each ad P.; Finish a series of 2 art. c/N in the basic loop of the Lifting loops, 1 nozzle. Art. In the 3rd. P. Lifting (= 18 St. S/N, considering the lifting); From 2nd to 6th p.: 3. P. lifting, 1 art. c/N in each art. From the previous row to the next one. N. Base series, 1 fan of 5 art. c/N, 1 art. c/N in each art. c/N base row, 1 nozzle. Art. In the 3rd. P. lifting. Tie so four more rows in the scheme, adding loops in each row from both ends of the work with the help of fans of 5 art. c/N.

Sole and side: 7th P.: Continue to knit on one side of the heel, and on the other side to tie a row of the rear. On which the cuff will be connected later (see diagram). To start the series as well as the previous ones, having failed the three-way. P. Lifting and 1 art. c/N in each art. C/N Base series, then link 1 art. c/N in the middle art. S/N of the first fan of 5 art. S/N, 28 P. and 1 art. c/N in the middle art. S/N of the second fan of 5 art. c/N and further knit to 1st. c/N in each art. S/N of the previous row, 1 co-ed. Art. In the 3rd. P. lifting; 8th and Next rows (lower): 3. P. lifting, 1 art. c/N in the next 13 art. c/N, in the following 5 p. Knit: 1 Decrease (1st. S/N, Proyazhuv together, in the next 2 p.), 1 art. c/N and 1 decrease; 1 art. c/N in each next art. c/N to 5 last art. c/N, 1 decrease, 1 art. C/n Next art. c/N, 1 decrease in the next 2 art. c/N, further on 1 art. c/N in each art. S/N, 1 co-ed. Art. In the 3rd. P. lifting. Then knit according to the scheme, making 4 down (2 on each side) in each second row; Link only 20 p. From the inlaid edge. Tie the last 2 p., making in each also 4 down, and trim the thread, leaving the long end of the thread to stitch the parts. Link the same part for the second Slipper. Sew to make a pipe


Reed: 1st P.: Fix the Melange thread in the right loop of the chain of 28. Related to the 11th P. Of the previous detail, to link the three P. Lifting, 1 decrease, 1 art. c/N in each of the following 22 art. c/N, 1 decrease, 1 art. S/N in the last build. N. of the series; Rotate the work; 2nd and Next rows: 3. P. Lifting, 1 decrease, 1 art. c/N in each next art. c/N to the last 3 p., 1 decrease and another 1 art. c/N in 3rd. Lifting of the previous series. Just tie 4 more rows, making 1 decrease on each side, work to finish. Just tie the reed for the second Slipper.

Cuff of the right slipper: a purple thread to tie a chain of 12. P., 1 art. b/N in art. c/n the left edge of the heel, 1st. b/N in each art. c/N Heel and 12 more. 1st P.: 3 P. Lifting, enter the hook into the 5th. P. Off the hook, 1 decrease (1st. c/N in the next 2 p., tying them together), 1 art. c/N in each of the following loops (S. N. b/N) to the last 2 years. P., 1 Fan (2 art. S/n in one next p.), 1 art. S/N in the last build. P., turn the work. 2nd R.: 3. P. Lifting, 1 fan, 1 art. c/N in each art. c/N to the last 3 art. c/N, 1 decrease, 1 art. c/N in 3rd. Lifting of the previous series. 3rd p.: 3. P. Lifting, 1 decrease, 1 art. c/N in each art. S/N of the previous series to the last 2 p., 1 fan and 1 art. c/N in 3rd. Lifting of the previous series. 4th and 5th p.: Knit as the 2nd and 3rd P., at the end of the 5th p. to link 12. P. and turn the work. 6th R.: 3. P. Lifting, enter the hook into the 5th. P. Off the hook, 1 fan, 1st. c/N in each loop (in the construction and C/N) of the base row, 1 decrease in the last 2 art. c/N, 1 art. c/N in 3rd. Lifting of the previous series. 7th P. (with a button hole): 3. P. Lifting, 1 decrease, 1 art. c/N in each art. C/N Base series to the last 5 art. S/N, 1 AD N., skip 1 art. c/N, 1 art. S/N in the last 4 p. 8th p.: 3. P. Lifting, 1 decrease, 1 art. c/N in each art. c/N to the last 3 p., 1 decrease, 1 art. c/N in 3rd. N. Lifting of the previous series; Work finish

Cuff of the left slipper: a purple thread to tie a chain of 12. P., 1 art. b/N in art. From the left edge of the heel of the left Slipper, to 1st. b/N in each art. S/N of the heel, 22 12 Further knit symmetrically cuff right slipper according to the scheme, at the end of the 8th p. Work Finish




Button: Tie a chain of 4. and connect it to the Ring 1 nozzle. Art. Tie in the Ring 7 art. b/N, then two more rows of art. b/N, Projazyazh columns also in the center of the Ring of the Vozd. N. and closing subsequent columns previous; Linking 3 or more rows, so that the center of the Ring of the N. was completely closed, tie 2 coed. Art, work finish. Link one More button and sew the buttons to the center of the cuff opposite the holes

Assembly: On the reverse side of the free end of the thread sew the Cape Slipper, connecting the hinges of the sole with loops of the upper part. Just sew the mouse second slipper.




Source : Вязание Приложение к журналу №11/2015







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments