Emma

Knitting Socks Boots Free Pattern

Click For Crochet Abbreviations List

You will need: 320 g of creamy wool yarn of medium thickness; Spokes № 5.5; 4 oval wooden beads. Elastic band 1/1: Alternately 1 persons., 1 H. Platelka Mating: persons. and N. P. – Persons. P. Facial Surface: persons. P. – Persons. P., N. P.-N. N. purl Surface: persons. P.-N. P., N. P. – Persons. P. kosa (Width 16 p.): Knit according to the scheme. Density of knitting, obverse surface: 15 p. = 10 sm. Upper part: Thread in 2 addition to dial 58 and knit as follows: 21 p. Elastic band 1/1, starting with 1 persons., 16 p. Oblique and 21 p. Elastic band 1/1. After 15 SM postpone on both parties on 21 p. and to knit only on average 16 p. oblique; After 14 cm to postpone these 16 p. lateral Parts with relief strips: to touch on drawing the first postponed 21 p. (Holding work of persons. side to itself), to dial 14 p. On the right edge of the top part, to carry postponed 16 p. Top part, to dial 14 p. On the left edge of the upper part and the last postponed 21 p. (= 86). In the next row on the Side to touch all the loops of the faces. (relief strip), tie another 2 p. Platelkoj (the second relief strip), 4 p. Persons. and 4 p. Platelkoj (2 more relief strips). Sole: 1st P.: 5 persons, 2 p. Together persons, 30 persons., 2 p. Together (remove 1 p. as persons., 1 persons. And stretch it through the removed loop), 8 persons., 2 p. Together persons., 30 persons., 2 p. Together, 5 persons. (= 82 p.); 2nd and all even rows: all of them; 3rd p.: 4 persons, 2 p. Persons, 30 persons, 2 p. Together, 6 persons., 2 p. Together persons., 30 persons, 2 p. Together, 4 persons. (= 78 p.); 5th p.: 3 persons, 2 p. Persons, 30 persons, 2 p. Together, 4 persons., 2 p. Together persons., 30 persons., 2 p. Together, 3 persons. (= 74 p.); 7th P.: 1 persons., 3 p. Together persons., 30 persons., 3 p. Together double-Draw(remove 1 p. As persons., 2 p. Together persons. And stretch this loop through the removed), 3 p. Together persons., 30 persons., 3 p. Together double stretch, 1 persons. (= 66 p.); Link 1 Series and close all loops. Assembly: Perform the seam of the center of the soles and the back seam of the front, starting from the heel. Prepare 2 cords 40 cm long and tie them to the top edge of the center of each sock, after holding the hinges of the spit. Extend the ends of the cords into beads and fasten the knots

Pattern Here :



Pattern 2 Here :





Socks Boots View :





Socks Boots Under View :




Source : Вязание Приложение к журналу №11/2015







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments