Click For Crochet Abbreviations List
Dimensions: 36/38 (40/42-44/46 in).
The data for the size 40/42 are given in parentheses before the dash, for the size 44/46-after the dash.
If only one value is specified, it applies to all 3 dimensions.
You will need:
Yarn "Vero Print" from Lana Grossa (60% cotton, 40% silk, 75 m/50 g):
Variant A: About 250 (300-350) G yarn red/pink/Natural Color (fb110) and violet/cyclamen/Natural (fb104) and about 50 g of pink melange yarn (FB10)
Variant in: About 250 (300-350) g of yarn of mint color (fb13) and color turquoise/light green/Natural (fb114) and about 50 g of turquoise Color (FB4);
Option C: approx. 250 (300-350) G yarn color: natural/cane/light blue/Lilac (FB 109) and pale pink (FB 14) and about 50 g of melange yarn of Grey-blue color (FB 15);
Option D: About 250 (300-350) G yarn color: Pale Pink (FB 14) and melange yarn gray-blue color (FB 15) and about 50 g dark Gray (FB 108);
Variant e: approx. 250 (300-350) G yarn color: natural/cane/light blue/Lilac (FB 109) and green/cane/natural (FB 111) and about 50 g of melange yarn of Grey-green color (FB 11);
Variant F: Approx. 250 (300-350) G yarn color: violet/cyclamen/natural (FB 104) and jeans/Anthracite/Bordeaux/Natural (FB 113) and about 50 g of sea color (FB 5)
Variant G: Approx. 250 (300-350) G yarn color: White (FB 9) and dark gray/natural (FB 108) and about 50 g black color (FB 8)
Spokes № 8 and 9 and 1 hook № 8.
Jacket pattern of the shot loops
Knot Edge:
The 1st loop of each row is removed as a person.
The last loop of each row is a person's touch.
Note:
All details are knitted with a knot edge.
Elastic band from the shot loops:
Knit according to scheme a.
The numbers on the left show the isn. P., right-front.
In width The row starts with loops before the 1st arrow, Projazat Raport = 2 p. Between arrows and to finish loops after the 2nd arrow.
Tie in height 1 x from 1st to 4th p., then constantly repeat these 4 rows.
Pattern of the shot loops:
Knit according to scheme B.
The numbers on the left show the isn. P., right-front.
In width The row starts with loops before the 1st arrow, Projazat Raport = 2 p. Between arrows and to finish loops after the 2nd arrow.
Tie in height 1 x from 1st to 4th p., then constantly repeat these 4 rows.
Density of Knitting:
Pattern of the shot loops on the spokes № 9:14 p. and 22 P. = 10 x 10 cm.
Note:
Arrows on the pattern = direction of knitting.
Performance of work:
Variant A: The jacket is knitted in three parts.
At first the backrest with a half sleeve is knitted, then the symmetrical shelves with a half sleeves are knitting.
Start with the left half of the backrest sleeve.
To do this, the spokes № 8 thread color red/pink/natural dial 39 p.
For a lath projazat 4 sm = 12 p. A rubber band from the taken out loops, as it is shown, to start with 1 izn. Row.
Go to the Spokes № 9 and continue with the pattern of the removed loops, and also start with 1. Row.
After 16 cm = 36 p. From the bar from the right working edge for the length of the backrest to reach 38 (40-42) New P. = 77 (79-81) p.
Now knit straight and added loops to include in the pattern of the captured loops.
After 27 (29-31) cm = 60 (64-68) p. From the sleeve strap from the left working edge mark the beginning of the neck cut and continue straight.
After 11 cm = 24 p. From the marker reached the middle of the backrest.
The part from here to continue and to finish symmetrically, thus instead of additions to do a decrease and, accordingly, to continue a pattern.
After the last row of strap sleeves close the loop.
Left shelf with half sleeves:
On the spokes № 8 thread color violet/cyclamen/natural dial 39 p.
For a lath projazat 4 sm = 12 p. A rubber band from the taken out loops, as it is shown, to start with 1 izn. Row.
Go to the Spokes № 9 and continue with the pattern of the removed loops, and also start with 1. Row.
After 16 cm = 36 p. From the bar from the left working edge for the front length dial 38 (40-42) New P. = 77 (79-81) p.
Now knit straight and added loops to include in the pattern of the captured loops.
Through 27 (29-31) cm = 60 (64-68) p. From the strap of the sleeve for cutting the neck to knit shortened rows.
* To do this in the trail. 3 rows from the right working edge postpone 12 p., therefore, knit on 65 (67-69) p., thus after the 1st. P. Rotate with 1 scale and knit consistently on the current typesetting loops, repeat from * 3 times, only respectively knit less by 12 p.
Thus, for bevel cut of a neck all will be postponed 48 p. And thus will fail 16 p. of a pattern.
Now for the strap to continue on the spokes № 8.
On the trail. IPMs. P. (= 1st continuous isn. R.) consistently knit rubber band from the removed loops on all loops, and thus the scale accordingly to tie together with a trace. Loop according to the pattern, so as not to get holes.
At the same time in the 1st P. From the right working edge for the back of the neck to get new 14 p. = 91 (93-95) p. And on top of them to knit also rubber band from the shot loops.
At height of a lath 6 sm = 16 P. Loops to close on drawing.
Right shelf with half sleeves:
Knit symmetrically to the left shelf with a half sleeve.
Assembly of Parts:
The details are spread, humidify and let dry.
Run seams sleeves-shoulder and sleeve-side sides in one reception