Click For Crochet Abbreviations List
Age: 5-6 years
You will need: yarn (50% cotton, 50% viscose, 375 m / 75 g) - 250 g orange, a little light orange yarn,
hook number 2.
Description of work: tunic is knitted from top to bottom. Type a chain of 50 air. etc., and knit a pattern according to the scheme, repeating the 2nd and 3rd rows 14 times, adding in each row on both sides 1/2 "shells".
In the 13th row for the back, type 70 air. etc. and continue knitting in a circle pattern.
From the 15th to the 23rd rows, knit according to the scheme of the 4th and 5th rows,
from the 24th to the 31st - according to the scheme of the 6th and 7th rows, the
last two rows of the sarafan - the 9th and the 5th rows 10th series on the chart.
Assembly:for straps, tie 4 strings of 30 air. etc., tie two straps of 60 air. etc. and attach to them 4 strings of 30 air. etc. At the same time, each cord is tied 1 next to the st. with / n. The upper part of straps and sarafan tie a yarn of light orange color 1 next to the "steppe step". The hem of the tunic is tied with the same yarn 1 next to the "pico". Tie a cord of 150 air. etc., thread it along the waistband of the tunic, decorate the edges with wooden beads.