Helena

Knitted Jacket with Hood and Pockets

Click For Crochet Abbreviations List

DIMENSIONS
116/122 (128/134) 140/146 



YOU WILL BE REQUIRED
Yarn 1 (62% of sheep's wool, 18% of polyamide, 10% of viscose, 10% of polyacryl, 200 m / 50 g) - 250 (300) 300 g of gray; 
yarn 2 (100% sheep wool, 150 m / 50 g) - 50 g white, dark blue and gray-blue; 
yarn 3 (100% polyamide, 100 m / 50 g) - 50 g white; spokes number 2, 5 and 3; circular knitting needles No. 2,5 in length of 80 cm; double-sided gray zipper in length 42 (44) 50 cm.



PATTERNS AND SCHEMES

ELASTIC
Alternately 1 front, 1 purl.



FACE GLADE
Face series - facial loops, purl rows - purl loops. In the circular rows, all loops are sewn with the facial.



JACQUARD PILLOW "SINKERS"
Knit by the given counting scheme. In height, tie 1-46-rd river. 1 time. 


DENSITY OF ABRASION
27 p. X 38 r. = 10 x 10 cm, connected by the facial surface.



PATTERN




COMPLETING OF THE WORK

BACK
With a gray mixed thread on knitting needles 2,5, dial 105 (115) 123 loops and bind for the plank 6 cm = 27 p. elastic, while in the 1-r. = the purl series begin after chrome. with 1 front, 1 purl and finish symmetrically. 

Then go to the spokes number 3 and knit the front surface. 

After 23 (25.5) 29 cm = 88 (96) 110 rubles. from the lath to close on both sides for the armhole 1 x 3 p., then in each 2nd p. 1 (2) 2 x 2 n. And 7 (6) 6 x 1 n. = 81 (89) 97 n.  

After 15.5 (17) 19 sm = 58 (64) 72 r. from the beginning, the armhole is to be closed on both sides for the shoulder rims 1 x 8 (8) 9 n., then in each 2 nd r. 2 х 7 (8) 9 items. In the next 2-nd р. close for the neck on both sides the remaining 37 (41) 43 p.



LEFT STICK
With a gray mixed thread on knitting needles 2,5, dial 49 (54) 58 loops and bind for the plank 6 cm = 27 p. elastic band, while in the 1st p. = the purl series begin after the crome. with 1 purl, 1 facial. 

Next, knit the knitting needles with faceplates. 

After 1 cm = 4 p. from the bar, starting with 2 (8) 11th point, knit the Snykers' motif. For the entrances to the pockets close in the 12th р. = the back row of the executed motif, the 11th item = the double arrow, tied up to the 35th place of the motive temporarily, leave and continue to knit only for the remaining 13 (18) 22 items, then leave the work temporarily. Now in the next front row, take a left-side left for the sacking of the pocket with a gray 36 thread of mixed thread and knit with the front surface. The Snykers' tail is finished with the remaining 3 r. motif, then, like the rest of the loops, knit with a gray thread. 

After 10 cm = 45 p. from the bar leave all the loops. Now continue to knit on the left side of the pocket left on the left side of the pocket, starting from the 12th р., While continuing the performed motive and the indicated deductions from the 12th point or from the double arrow = 17 points in the 41st р. 

In the 42nd r. = back purl on all hinges, for which purpose lay the remaining 17 sts for the last 17 sts of the sacking of the pocket and tie together the back of the first sackcloth and 1 st of the front side together, while performing the motif. 

Then tie the 43-46th river. motif and after that a gray mixed thread to knit on all the loops. 

After 23 (25.5) 29 cm = 88 (96) 110 rubles. from the lath to close on the right edge for the armhole 1 x 3 p., then in each 2nd p. close another 1 (2) 2 x 2 n. and 7 (6) 6 x 1 n. = 37 (41) 45 p. 

After 11.5 (13) 15 cm = 44 (50) 58 r. from the beginning of the armhole close for the neck on the left edge 1 x 6 (8) 9 p. and in every 2 nd r. 3 x 2p and 3 x 1p.  

On the right edge after 15.5 (17) 19cm = 58 (64) 72p. from the beginning of the armhole to perform a shoulder bevel, as on the back. 



RIGHT STICK
Knit, as the left, but in a mirror image, while the motif of snikersov knit symmetrically.



SLEEVES
With a gray mixed thread on knitting needles 2,5, dial 58 loops (58) for each sleeve and fasten 6 cm = 27 p. rubber band. 

Then go to the spokes number 3 and knit the front surface. 

For bevels, add on both sides in 13 (11) the 9th river. from the bar 1 x 1 st., in each 12th river. 2 x 1 p. And in every 10th p. 6 х 1 р. (in each 10th river 6 x 1 river and in each 8th river 5 x 1 n.) in each 8th river. 14 x 1 n = 76 (82) 92 n.  

After 28 (31.5) 34 cm = 107 (119) 129 r. from the strip to close on both sides for the pellet sleeves 1 x 3 p., then in each 2-r p. 1 x 2 n., 10 (13) 17 x 1 n., 1 x 2 n., 1 x 4 n. And 1 x 5 n. = 24 (24) 26 n.  

Through 8 (9,5) 11, 5 cm = 30 (36) 44 r. from the beginning of the pellet, close the hinges.



HOOD
With a gray mixed thread on knitting needles No. 3, dial 167 (177) 189 loops and knit with the front surface. 

To round off the notch of the shelves, close on both sides * in each 4th r. 1 x 1 p. And in every 2-rd p. 1 x 1 p., From * repeat 4 times and in each following 2 nd p. close 1 x 1 point (* in each 4-th river 1 x 1 point and in each 2-nd river 1 x 1 st, from * repeat 4 times and in the next 4-th river close 1 x 1 item) * in each 4-th р. close 1 x 1 st. and in every 2-rd river. close 1 x 1 st., from * repeat 4 times and in the next 6th r. close 1 x 1 n. = 149 (159) 171 n. After 13 (14) 15 cm = 50 (54) 58 r. from the initial row close the middle loop and first finish the left side. 

For the upper rounding of the hood along the inner edge, close in each 2-rd r. 8 x 1 st and 4 x 2 n. 

Simultaneously, after 3 cm = 12 r. from the division of knitting to close on the outer edge of 1 x 4 p., then in each 2-r p. 1 x 4 p. And 6 x 3 p. (3 x 4 p. And 4 x 3 p.) 6 x 4 p. And 1 x 3 p = 32 (35) 38 p.  

After 7.5 cm = 28 R. from the separation of knitting to close the loop.



LOCKING PLUG (2 DETAILS)
With a gray mixed thread on the spokes No. 3, dial 4 pcs and tie 42 (44) 50 cm = 160 (168) 190 r. facial smoothness. Loops close.



ASSEMBLY
At the edges of the entrances into the pockets, draw a dark-gray thread on the spokes No. 2,5 for 31 p., And tie 2 cm = 8 r. elastic, while the last 2 p. to knit a blue-gray thread. Loops close. 

Embroider the holes for the laces with a white thread with a stalk seam. Stitching on both sides of the holes for the laces embroider a white thread 2 r. stitching the seam "forward the needle," while dislodging the upper stitches in each side with a parallel row. At the bottom along the upper edges of the Sneakers in the 37th and 39th rivers. motivation to embroider 1 p. offset by stitching stitches "forward needle". On the slats of the pockets on the front between the blue-gray and dark-blue patches lay a white thread 1 p. stitches "forward needle". Pass the laces from the white polyamide thread: hold the needle in each lace opening and, to prevent the threads from slipping, hold the needle between the hinge walls on the fixed edge of the strap and pull the needle right under the fixed edge on the wrong side. 

The narrow sides of the strap are sewn to the shelves. Run the upper seam of the hood. Perform shoulder seams. Hood sewn into the neck, see the alignment marks on the pattern, with the edges slightly pripasadit. 

On the edges of the fasteners of the shelves and the facial cutout of the hood, type on circular knitting needles No. 2.5 with a gray mixed thread 413 (448) 488 stitches and tie a 1.5 cm elastic band. Loops close. 

Use a gray sewing thread to sew a zipper between the fasteners of the fastener, bound elastic band (external straps) and zipper straps (inner straps), then sew parts with a zipper to the edges of the fastening of the shelves. Sew up sleeves. Carry out the seams of the sleeves and the side seams. 







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments