Kathie

Crochet Summer Set For Dolls

Click For Crochet Abbreviations List

Materials and tools:
Yarn type SOSO (Vita Cotton), 100% mercerized cotton, 240m / 50g, your chosen color, a little
white yarn for finishing (I used Alize Forever, 100% microfiber-acrylic, 300m / 50g, it is softer than SOSO and
more suitable for decoration). It is possible to replace the SOSO with another yarn, the main thing is that the thread must not be
soft.
Buttons sewn up to 1cm, 2pcs.
Hook 1.25mm.
Abbreviations:
P. - the loop
V.p. - air loop
V.p.p. - air lifting loop
RLS - column without crochet
SSN - a column with a single crochet
SS - connecting post
Prev - previous / previous
Track. - next / next
The slave. - working

Knitting density:

The density of knitting is different for each person. Tie a sample from the CLS, for example, from a 20-foot and 10-row,
compare with the density given here and adjust for yourself by selecting the hook of the larger and
less than. I have a density: 16SSN x 6.5 rows = 5 x 5cm.
Features of knitting:
In this SNG sarafan, I'm tying not in two steps, but in three, as follows: on the hook, etc., I make a cape,
I enter the hook in the pre. row, seize the slave. thread, stretch n. (small!) and tie it. On
hook - n., nakid and tied n. I seize again rabint.nit and tie n. and nakid. Two hooks on the hook -
I bind them together. This is reminiscent of tying a column with 2 nakidami, but instead of n. And the first
nakida, we only sew a noose. This gives the volume a bar, and when knitting a skirt and necessary
density for acceptance of form. Knit the bars tightly. With unaccustomed, it slows knitting and, if
It is difficult for you, knit conventional CLD.
2SSN with one vertex, tied from one loop: one hook on the hook, we make a cape, we introduce a hook in
We seize the worker, pull him out, and we sew it with a cuff-on the hook, two sts, again
we make a crochet, we introduce a hook in the tighter p.pred.reda, grab rab.non, pull out the n. and tie it with
on the hook, three stitches - we sew them in one go. These 2CON with one vertex from one point, we
we will only bind at the beginning and at the end of the series, then - only bundles of 4 CLOs.
A bundle of 4 CLS, tied in pairs from two different loops: one hook on the hook, we make a cape, we introduce
hook in the point of pre-order, grab rab.non, pull out the n. and tie it with a cuff - on the hook two n. (
tied one unfinished SSN), again we make a cape, we introduce a hook into the tighter part of the pre-order and we sew
the second incomplete CLS, as described above, on the hook three points, skip two paragraphs. row, we introduce a hook
in succession. and we are tying two unfinished CLOs from this point. row, on the hook, five points - we tie them for
one reception. (I described the banding of conventional CLS, but I knitted the CLS as described above).










Knitting begins with the bodice, "from under the mice", from the top - down.
Row 1: dial 54 bp. + 3 timesp. (replacing the first CLS), CLS in the 5 th point from the hook, on the 1SN in the next. 2n., * 2-nd cp,
a bundle of 4 CCNs (the first 2 unfinished CLOs are tied in the next section of the pre-order and also: the airborne chain
consists of 3 strings - advice: try to enter the hook under the 2 nets, which will not allow you to stretch the stitch.
four punctures) * - repeat 15 times, 2nd cent, on 1SN in the next 4p., knit turn. (see photo
higher). Row 2: 1в.п. (not a RLS, the first RLS is knitted in the last item of the pre-order), according to 1СБН in 4p., Starting with the first, *
2СБН under the 2-nd cp, 1СБН in the next steps * - repeat 15 times, 2СБН under the 2-nd cp, 1СБН in the next. 4n., Knit to turn.
Row 3: 3 bp, on the ICS in the next. 3n, let us pass the 2nd point, 2CNH with one vertex in the next section, * 2nd eps, the bundle from 4CLN:
the first 2 unfinished CLOs are tied in the tighter p.chains, where the 2SN was tied with one vertex from one
loops, skip the 2nd point, 2 unfinished CLOs to the next point, on the hook 5n. - We tie them in one
reception * - repeat 14 times, 2 nd, 2CN with one vertex from one n. (from n., to which the last ones were tied
2SSN from the beam), skip the 2nd point, on the ICN in the next. 4n., Knit to turn.
Row 4: 1pp (not a RLS), according to 1СБН in 4p (this is the bar), 1СБН in the next .p, * 2СБН under the 2 nd cp, 1СБН in the next. * -
repeat 14 times, 2СБН under the 2-nd cp, 1СБН in the next. 5p., Turn knitting.
Row 5: 3 bp, on the ICS in the next. 3p., * 2nd eps, a bundle of 4 CCNs (the first 2 unfinished CLOs are tied in
next. pri.reda) * - repeat 15 times, 2 nd cp, 1 st in the next 4p., knit turn.
Series 6: 1 stp, 1 cbn in 4p, starting from the first, 1SBN under the 2 nd cp, * 1СБН in the next, 2СБН under the 2 nd ct, * - repeat
14 times, sc in the next, 1СБН under the 2-nd cp, 1СБН in the next. 4n., Knit to turn. (53 p.)








































Let's go to knitting the skirts.
Row 7: 3 cpp, (are CCH), on ICS in the next 4p., 2CN in the next. 2n., 2CN in the next. *, -
repeat 14 times, according to 1SN in the next 5p. Knit to turn. (68 p.)




Row 8: The connecting bars move the beginning of knitting by 6p., Knit turn, 3pp, 1cc in
next, put the right shelf on the left so that the n sides coincide, the first 4 and the last 4 loops of the row,
we sew on the ICN in the trace. 4 sts, picking up the loops of both slats by the hook, on the ICN on the next. 2p., * 2v.p., according to
1ССН in the next. 8n. *, - repeat 7 times, 2in.p., SS to the top of the first STS (not in the loop of lifting!) Of the beginning of the series.
Knitting does not rotate.



















Row 9: 3vpp, on1SSN in the next 6p., * 2vp, SSN under the 2vp. before. series, 2в.п., the first ССН before. of the series
1SN in the next.7p. *, - repeat 7 times, 2v.p., SSN under 2v.p. before. series, 2в.п., СС to the top of the first СНН of the beginning of the series.
Row 10: 3pp, for 1SN in the next 5p., * 2vp, for the first 2vp, 2vp, for the second pair of vp, 2vp. ,
skip the CCN before. of the series, in the first column in the next column., * - repeat 7 times, 2in.p., CCN for the first 2v.p., 2v.p., CCN for
second 2v.p., 2v.p., SS to the vertex of the first COS of the beginning of the series.
Row 11: 3vpp, for ICS in the next 4p., * 2vp, SSN under the 2vp. before. series, 2в.п., ССН under a trace. 2в.п., 2в.п., ССН under
track. 2в.п., 2в.п., to pass IССН before. series, according to ICS in the next 5p., * - repeat 7 times, 2in.p., SSN for the first 2v.p.,
2в.п., ССН under a trace.2в.п., 2в.п., ССН under a trace.2в.п., 2в.п., СС on top of the first СНН of the beginning of a number.







Row 12: 3pp, for ICS in the next 3p., * (2in.p., SSN under the 2nd century before the series,) - repeat 4 times, 2v.p., skip ISCN
before. row, on the first stage in the next 4p. * - repeat 7 times, * 2v.p., SSN under 2v.p. before. series, * - repeat 4 times, 2в.п., СС in
the vertex of the first COS of the beginning of the series.
Row 13: 3pp, for ICS in the next 2p, * (2in.p., SSN under the 2nd century before the series,) - repeat 5 times, 2vp, skip ISCN
before. series, 1 SSN in the next 3p. * - repeat 7 times, * 2v.p., SSN under 2v.p. before the trial, * - repeat 5 times, 2в.п., СС in
the vertex of the first COS of the beginning of the series.
Row 14: 3pp, SSN in the next, * (2in.p., SSN under the 2vp pre-order,) - repeat 6raz, 2v.p., skip the ISSN before.
series, according to ICC in the next 2 *. * - repeat 7 times, * 2в.п., ССН under 2в.п. before. series, * - repeat 6 times, 2 in., SS in
the vertex of the first COS of the beginning of the series.
Row 15: 3pp + 2в.п. (for the arches), * (ССН under the 2в.п. prev series, 2в.п.,) - repeat 7 times, skip the 1CN prev.
series, SSN in the next., 2в.п., * repeat 7 times, * ССН under 2в.п. before. series, 2в.п., * - repeat 7 times, СС in top
The first STS of the beginning of the series, the connecting post moves the beginning of knitting to the center of the trail. 2в.п.










Row 16: The entire series consists of a sirloin grid: CCN, 2in.p., SSN. Dial 3 bp + 2в.п. (for arches - grids),
skip the CCN before. series, SSN under the track. 2в.п. We knit the sirloin grid to the end of the series, at the end - the SS in the 3rd vp,
cut and fasten the thread.
















We finish knitting the bodice of the sarafan.
Row 1: Turn the bodice to the wrong side. We skip 4 sts of the bar, etc., from which 2SN were knitted from one
a vertex from one point, * 2in, n, from which a bundle of four CCNs was knitted, * - to skip 4 times, under the trace. 2в.п.
we start the hook, grab the worker. (who makes the initial loop at once - do it), pull it out
ourselves, grab slave.nit and tie it on the hook, pull up and lay the end of the thread (its we
we will be involved in a series of RLS), here, under the 2 nd cp. before. row, we are tying the first RLS, the RLS in point, from which
knit a bundle, * 2SBN under 2vp, SBN in the next.p., * - repeat 5 times, RPS under the trace. 2в.п., knitting we turn. ( 18
RLS)
Row 2: 3pp + 2в.п. (for the arch), * we knit a beam from 4-Х ССН: the first 2 unfinished columns are knitted in the next.
before. series, skip 2p., 2 unfinished CLOs in the next., on the hook 5n. - tie it in one go, 2v.p., * -
repeat 5 times, CLS at the last point, knit turn.




























We knit the right strap.
Row 1: 3vp, 2SNN under the 2nd century. before. row, skip the trace. p., 2SN under the footprint 2v.p., SSN in the next. crocheting, knitting
to turn.
Row 2: 3pp, for 1SN in the next 5p., Knitting turn.
Repeat the 2nd row until the desired length of strap, determine by fitting. The last row (I have the 9th) I
tied it like this: 2СБН, 2 полустол. CH, 2SSN. It all depends on where you will fasten the strap, perhaps you
so you do not need to tie it.







We attach the strap.
We tied the right shoulder strap. Now we will attach it: you can sew and sew, but I tied it
crocheted. On the right shelf of the backrest, from the edge, we count 6n: 4n. slats, 1 next. and ln. from two points Beginning
from the second vp, we count off another 6n, to which we will attach the shoulder strap: the second cp. + next. + 2в.п. +
next. + first cp = 6n. On the strap we also have 6p. In order not to be mistaken, tie the strings or attach
markers on arches from 2 c. the bodice.
We turn the strap to your back, through the side of the bodice, lay it, as if turning it
down, we combine the last straps with the p., which we defined, so that the front side of the straps
aligned with the front right side of the backrest. We combine the loops and join them, tying the RLS in
track. 6 pairs of loops. Where cp, the hook is introduced under the HP. Try to tie tightly so that the strap does not
dangling, since when dressing a sarafan, the straps may have to be pulled on the chrysalis ... 







We knit the left shoulder strap.
The left shoulder strap is knitted similarly to the right one, you can start knitting both from the front side of the bodice, and from
purl. From the front: we enter the hook in the 3rd paragraph. before. row, seize the slave. thread, stretch n.
fix it, lay the initial end of the thread along the knitting.
Row 1: 3vp, 2SNN under the 2nd century. before. row, skip the trace. n., 2SSN under the trace of 2v.p., SSN in the next.p., knitting
to turn.
Row 2: 3pp, on the ICS in the next. 5n., Knitting to turn.
We knit the shoulder strap to the desired length, attach it to the back. We fix and cut the thread.
Bundling of the bodice of the sundress.
Turn the dress with the front side and shoulder straps to yourself. We take the thread for the finish.
We introduce a hook under the last CLS of the last row of the bodice, we seize the slave. thread, stretch and fasten
the first loop, the 3pp, the 2NSN under the same SSN of the last row of the bodice, "we introduce the hook under the top of the beam of 4
SSN last line of the bodice, grab slave. thread, stretch and fix n., tying in the RLS, 3vp, 2SSN,
each time inserting a hook under the same top of the beam of the last row of the bodice. "- repeat 4 more times. At the end
strapping fasteners SBN to 3v.p.p. the last row of the bodice. The thread is fastened, cut off, the "tail" is hidden, using
needle.




























Tie the hem of the sarafan.
Arrange sarafan faces. side up and bodice to yourself, choose any mesh box
the last row of the skirt (I started from the side). We introduce a hook under the STS of the last row of the sarafan skirt,
grab the slave. thread, draw a loop and fasten it, 3pp, 2CNN under the same CLP of the last row of the skirt
sarafan, "we introduce a hook under the trace. SSN the last row of the skirt sarafan, fastened to it, tying the SS,
3в.п.п., 2ССН under the same СНН of the last row of the sundress skirt "- we continue to carry out this element throughout
width of the hem of the sarafan, at the end: we introduce a hook from the side of the fabric of the skirt, from the top to the bottom, to the bases of the 2
COS and 3in. the first element of the binding of the hem, we pick up the slave. thread, stretch n., tie the SS.
Cut and fasten the "tail" using the needle.





































The photo shows how I tied the RLS, combining the strapping elements, but as experience has shown, it is better to perform the SS.
We knit the basis for the flower.
Dial a chain of 6 bp, close in the SS ring.
"3в.п.п.п., (it is considered СНС) 3ССН in a ring from 6 vp, to turn knitting, 3в.п.п., on 1ССН in a trace. 2n. before. series and
SSN in the 3rd cp. before. row, turn knitting, pull the hook slightly back and forth, RLS into a ring of 6
vp "- this element is repeated 4 more times. To fix and cut off the thread, the "tail" can be hidden: since the base
we knit from a different color, then to a skirt to sew a basis with a flower is better a thread from a flower.


































We knit a flower.
We take the yarn of the main color.
In the "magic" ring: dial 3pp, 2SN, 3v.p., fastened to the ring, tying the RLS. Have completed the first
flower petal. Repeat the "petal" element 4 more times. Tighten the "magic" ring by pulling
the initial end of the thread, fix and hide the thread on the wrong side of the flower with a needle. Working
thread also bring to the wrong side of the flower, fix and leave a piece of thread, sufficient for
connect the flower with the stem. (You can sew the same thread to the whole element to the skirt of a sarafan, but you can
use a thread that will attach the bead to the center of the flower.) Sew a flower to the base,
desire, bead.
If you do not know how to form a "magic" ring, tie a chain of 4 bp, (the first point of the chain will be replaced
"Magic" ring + 3vpp), in the first n chain chain 2SN, 3v.p, SBN in the same loop. The
the first petal. Repeat the "petal" element 4 more times. Next - everything, as described above.







Crochet Summer Set For Dolls is Ready




Author: Irina Tuchkova (Belanova)
Source : https://vk.com/id248794394








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments