Click For Crochet Abbreviations List
Sizes
- M - L - XL - XXL - XXXL
Materials
Yarn DROPS PARIS (100% cotton, 50 g / 75 m) 10-11-12-13-14-15 skeins, circular needles 4 mm and 5 mm, hook 4 mm
Knitting density
17 loops and 22 rows = 10x10 cm front stitch on the needles 5 mm
Description of the jacket with needles for women
Note: on the diagram of the pattern M.1 all the rows are shown when viewed from the faces. parties.
Right shelf
On the 4 mm knitting needles, dial 44-48-51-55-60-65 p. And knit 6 rows with a shawl pattern, switch to the 5 mm knitting needles and continue: 3 s. With a shawl pattern, 4 p. According to scheme M.1A, 6-6-12-12-12-12 p. According to the scheme M.1B, 3 p. According to the scheme M.1C, 27-31-28-32-37-42 p. Front face, chrome Knit according to the pattern and after 13-14-15-16-17-18 cm reduce 1 point from the side edge, repeat a series of decrease after 5 cm only 6 times = 38-42-45-49-54-59 point.
Read the description below completely before you continue knitting !!!
Decreases for neckline: after 43-44-45-47-48-49 cm from the dial edge, subtract 1 p. To the next. persons (from the edge of 3 pp. knitted garment), in each 4-4-4-2-2-2 row 6-6-6-9-9-9 times.
Additions for sleeves: at 48-49-50-51-52-53 cm at the end of each 2nd row, dial: 2 p. 2-4-3-3-4-6 times, 4 p. 4-2-3 -3-2-0 p. and then 15-15-16-15-12-11 p. 1 time. All new loops further knit facial surface.
After all the reductions in the neckline on the spokes 67-67-73-73-73-73 p., The next. persons continue: 3 p. with a handkerchief pattern, М.1А, М.1В to the last. 6 p., M.1C and 3 p. A scarf pattern. Through 72-74-76-78-80-82 cm put the marker = shoulder seam. Next, measure the length of this marker, knit 2 cm, finish in the inside. and put the loops back.
To tie the left shelf of a jacket symmetrically to the right shelf.
Back
First, knit the loops of the left shelf, then dial the new 11-11-11-17-17-17 p. For the neckline, and finish the row with the loops of the right shelf = 145-145-157-163-163-163 p. Knit 4 rows with a garter pattern on the center. 17-17-17-23-23-23 p. (The remaining stitches are knit according to the pattern) and then continue: 3 s. With a shawl pattern, M.1A, M.1B until the last. 6 p., M.1C, 3 p. A scarf pattern. After 18-19-20-21-22-23 cm from the marker (after 1 complete rapport according to the M.1 scheme), continue knitting with the front satin stitch, closing the loops of the sleeves in the reverse order when these loops are gathered, then knit 1 chrome each. P. on each side = 75-83-89-97-107-117 p. After 34-35-36-37-38-39 cm from the marker add 1 p. on each side every 5 cm only 6 times = 87- 95-101-109-119-129 p. After 70-72-74-76-78-80 cm go to the spokes of 4 mm and perform 6 rows with a shawl pattern,
Assembly
Run side seams and sleeve seams. Using a crochet hook, knit: * 2 air, 1 article. b / n in the 2nd draft, repeat from * to a length of 20 cm. Make one more string and sew them at the beginning of the neckline of the shelves.