Cathy

Tunic with a yoke of pearl pattern

Click For Crochet Abbreviations List

Sizes: 38/40 (42/44) 46/48 
You need: 650 (700) 750 g of yarn Cool Wool 2000 faded rose color (100% merino wool, 160 m / 50 g ); straight needles number 3.5; hook number 3. 
Wrong surface: persons. R. - ex. n., izn. R. - persons. p. 
Zigzag width 7 p .: knit according to a scheme in which only persons are shown. R. 
In izn. R. knit loops on the pattern, nakida - w. 
Repeat from 1st to 24th p. 
Zigzag pattern: the number of loops is a multiple of 13 (12) + 6 (5) + 2 chrome. 
Crom., * 6 (5) n. Izn. smooth and chrome. 
Figures in brackets refer to sleeves.
After the end of the reduction in front, the back and sleeves knit a trace. way: chrome., * 3 p. smooth surface, 7 p. of zigzag, repeat from *, 3 p. smooth 
Facial smoothness: persons. R. - persons. n., izn. R. - ex. n. 
Pearl pattern: an odd number of loops. 
Every p. start and finish 1 chrome. 1st reg .: alternately 1 out., 1 person., Finish 1 out .; 2nd and 4th b.: Knit loops on the pattern; 3rd b.: Alternately 1 person., 1 out., Finish 1 person. 
Repeat from 1st to 4th p. 
Knitting density Zigzag pattern: 23 p. And 31 p. = 10 x 10 cm; pearl pattern: 21 p. and 34.5 p. = 10 x 10 cm. 
Back: dial 138 (151) 164 p. And knit with a zigzag pattern.
At the same time, subtract from both sides for rounding of the hip in each 22nd p. 6 x alternately 1 x 5 and 1 x 6 items (6 x by 6 items) 6 x alternately 1 x 7 and 1 x 6 items. Trace. way: in every 2 nd track of izn. p. knit 2 p. together izn., starting alternately with the 2nd and 1st paths izn. p., while in every 2nd p. reductions are taken into account missed tracks from izn. n. = 105 (115) 125 p. 
After 50 cm = 156 r. from the typesetting edge tie 0.5 cm = 2 p. individuals. stitch, while in the 1st p. evenly subtract 8 (10) 12 points = 97 (105) 113 points. 
Then knit with a pearl pattern. 
At the same time add on both sides for side bevels, starting from the end of the faces. smoothing, 4 x 1 p. in every 6th p. (4 x 1 p. Alternately in each 4th and 6th p.) 4 x 1 p. In every 4th p., Including added loops in the pattern = 105 (113) 121 p.
Through 10.5 cm = 36 p. (8 cm = 28 p.) 5.5 cm = 20 p. from the graduation of individuals. smoothing close on both sides for armholes 1 x 4 p. 
Then in each 2nd p. 1 x 3, 2 x 2 and 2 x 1 p. = 79 (87) 95 p. 
Through 26 cm = 90 p. from the graduation of individuals. Smooth to close for neckline averages 21 (25) 29 p. and to finish both sides separately. 
For rounding the neckline close with the inner edge in each 2nd p. 2 x 5 p. 
Through 28.5 cm = 98 p. from the graduation of individuals. smooth close the remaining 19 (21) 23 p. shoulder. 
Before: knit the same way, only for the neckline close the average 11 (15) 19 points in 13.5 cm = 46 p. from the graduation of individuals. smoothing, then 6 x 1 p. in every 2nd p. and 9 x 1 n. in each 4th p. 
Sleeves: dial 103 (115) 127 p. And knit zigzag pattern.
For bevels, add on both sides for side bevels in each 32nd p. 4 x alternately 1 x 4 and 1 x 5 p. (4 x 5) 4 x alternately 1 x 5 and 1 x 6 p., As described for back = 85 (95) 105 p. 
Through 43 cm = 134 p. from the typesetting edge, close on both sides for wrap up the sleeves of 1 x 4 p., then in each 2nd p. 2 x 2, 15 x 1, 1 x 2, 1 x 3 and 1 x 4 p. (1 x 3, 3 x 2, 11 x 1, 3 x 2, 1 x 3 and 1 x 4 p.) 2 x 3, 3 x 2, 9 x 1, 3 x 2, 2 x 3 and 1 x 4 p. 
Through 56.5 cm = 176 p. close the remaining 21 (21) 23 p. from the typesetting edge. 
Assembling: shoulder seams. 
Neckline tie 1 circle, p. Art. b / n and 1 circle. R. "Rach'ogo pitch" (= Art. B / n from left to right). 
Sew on the sleeves. 
Run side seams and sleeve seams.








Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments