Emma

Knit Winter Cap Free Pattern

Click For Crochet Abbreviations List

Knit Winter Cap Description: 

50 gr-116 m, it took exactly three motochka without residue. Circular spokes for Gum № 3, for the main pattern 4.5 and hosiery № 4 for the crown. 

Knitted in 2 strings. On the size of 56-58 the gained of 96 loops, the elastic band was made as follows: * 3 Izn, 2 persons, 2 Izh, 2 persons, 2 Izh, 2 persons, 3 Izn * to the end of a circle, approximately 4 cm, further added as follows: * 2, add 1 out of stretch, 1, 2 persons, 2. , add 1 persons from the stretch, 2 persons, add 1 persons from the stretch, 2 izn, 2 persons, 1 izn, add 1 out of the stretch, 2 Izn * Repeat in a circle, total 120 loops (6 rapports on 20 loops). Further knit according to the scheme: 


Scheme to link 1 time all, from the 7th row of the beginning of the rapport to shift to two loops to the right, from the 17th return the start of the report on the 2 loops to the left, the second time to knit the scheme to the 13th row, from the 13th start to reduce the following way (I will write on the floor rapport , the rest is mirrored and repeated raport in a circle: 
2 persons, 2 Izn, to remove 2 loops on the additional spoke before work, 2 loops with the basic spokes to touch together reverse, to touch obverse loops with additional spokes, 2 izn, to repeat the second half of Rapport mirror (-12 loops) 
14 and all even rows up to the 24th row knit according to the figure 
15 Row: 2 persons to take off before work, 2 persons, 2 persons with additional spokes, 2 people to hang together, 1 izn, 2 persons to remove before work, 2 persons, 2 izn with additional spokes, then mirror (another-12 loops) 
17 Row: 2 persons to take off before work, 2 izn, 2 persons with additional spokes, 1 persons to take off on the right spoke not projazivno, to touch a trace of persons and to stretch through a removed loop, to mirror the second half of Rapport (the first two loops simply to touch together persons) (-12 loops 
19 row: 2 loops together, 2 faces to remove on the extra spoke before work, 2 isn, touch loop faces with additional spokes, 2 together front, 2 izn, 2 loops to remove on the additional spokes at work, 2 faces, 2 isn with additional spokes, 2 are to be involved together (here all rapport) 
21 Row: 2 loops at the beginning and at the end of the rapport to get together, the rest of the loops on the figure 
23 Row: 2 Izn, 2 persons to take off before work, 2 persons, 2 persons with additional spokes, 2 Izn 
24 row: 2 people to hang together, 4 persons, 
25 Row: 3 persons, 2 loops to hang together faces 
26 Row: 2 Loops together persons, will remain 12 loops, to stretch through them twice a thread and to tighten. 
Make the Pompom (I have a diameter of 8.5 cm) and attach to the CAP. 




Knitted in 2 strings. On the size of 56-58 the gained of 96 loops, the elastic band was made as follows: * 3 Izn, 2 persons, 2 Izh, 2 persons, 2 Izh, 2 persons, 3 Izn * to the end of a circle, approximately 4 cm, further added as follows: * 2, add 1 out of stretch, 1, 2 persons, 2. , add 1 persons from the stretch, 2 persons, add 1 persons from the stretch, 2 izn, 2 persons, 1 izn, add 1 out of the stretch, 2 Izn * Repeat in a circle, total 120 loops (6 rapports on 20 loops). Further knit according to the scheme: 




Scheme to link 1 time all, from the 7th row of the beginning of the rapport to shift to two loops to the right, from the 17th return the start of the report on the 2 loops to the left, the second time to knit the scheme to the 13th row, from the 13th start to reduce the following way (I will write on the floor rapport , the rest is mirrored and repeated raport in a circle: 
2 persons, 2 Izn, to remove 2 loops on the additional spoke before work, 2 loops with the basic spokes to touch together reverse, to touch obverse loops with additional spokes, 2 izn, to repeat the second half of Rapport mirror (-12 loops) 
14 and all even rows up to the 24th row knit according to the figure 
15 Row: 2 persons to take off before work, 2 persons, 2 persons with additional spokes, 2 people to hang together, 1 izn, 2 persons to remove before work, 2 persons, 2 izn with additional spokes, then mirror (another-12 loops) 
17 Row: 2 persons to take off before work, 2 izn, 2 persons with additional spokes, 1 persons to take off on the right spoke not projazivno, to touch a trace of persons and to stretch through a removed loop, to mirror the second half of Rapport (the first two loops simply to touch together persons) (-12 loops 
19 row: 2 loops together, 2 faces to remove on the extra spoke before work, 2 isn, touch loop faces with additional spokes, 2 together front, 2 izn, 2 loops to remove on the additional spokes at work, 2 faces, 2 isn with additional spokes, 2 are to be involved together (here all rapport) 
21 Row: 2 loops at the beginning and at the end of the rapport to get together, the rest of the loops on the figure 
23 Row: 2 Izn, 2 persons to take off before work, 2 persons, 2 persons with additional spokes, 2 Izn 
24 row: 2 people to hang together, 4 persons, 
25 Row: 3 persons, 2 loops to hang together faces 
26 Row: 2 Loops together persons, will remain 12 loops, to stretch through them twice a thread and to tighten. 
Make the Pompom (I have a diameter of 8.5 cm) and attach to the CAP.




Source : https://vk.com/knit_for_soul?w=wall-91498131_2425%C2%A0







Post your comment

Information!  You need to be a member to comment. You can easily sign up from here.

0 comments